Close Parallel Runways


Two parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3000 feet (750 feet for SOIA operations) for which ATC is authorized to conduct simultaneous independent approach operations. PRM and simultaneous close parallel appear in approach title. Dual communications, special pilot training, an Attention All Users Page (AAUP), NTZ monitoring by displays that have aural and visual alerting algorithms are required. A high update rate surveillance sensor is required for certain runway or approach course spacing.

Source: FAA Pilot/Controller Glossary (definition from the 2023 edition; current: Change 1 of 7 August 2025).

Related terms

Glossary last updated 2026-10-28.